12.04.2012

progress maker

 this is my ghetto ass fly sparge setup that I used to make a batch of java maker porter for nic for helping me with the brewstand. it worked a lot better than all the lifting involved with batch sparging, but not very pretty.
 i have a good feeling about this batch. ended up og1.050 after an almost 2 hr boil to get it reduced down to 11 gal from 13.
 nic burning in the top burner for the hlt.
 done welding it up. on the far left there are 2 custom hooks for hanging the extension cord from the switch box, my mash paddle, tubing, etc. nic hooked up a panel for the switch box which will have a gfci and protected switch for the pump control.
here it is all painted up nice. now to get the wood slats attached on the bottom and top levels, hook up the electrical, get the pump mounted, and we'll be in business. i placed an order at morebeer for some kent qd's and some other various parts to hook up the pump.

-kris

baker's tap

  • NZ pale ale (?.?%abv)
  • kimosabe red (5.5%abv)
  • [primary] bunch of mead and cider
  • [secondary] bunch more mead and cider

merrill's tap

  • fender tremelo (7.1%abv)
  • gibson rickenbacker (6.49%abv)
  • IPA (6.7% abv)
  • {nitro} McFricker Stout (5.5%abv)
  • [secondary] merrill's hard cider
  • [gettin' sour] derBrynnerweisse

in the ferminator

  • nothingmaker :( (og0.000)

All Content Copyright 2011 Berrill Maker. Powered by Blogger.